over winter tasks
Discussion
hi all just wondering what people are planning while we sit out winter (although damn fine tiv weather today) this will be my first proper winter period with the tuscan as last year it was up on a lift as jc's with the engine in bits!! first thing needs doing is as its now done 1100 miles since rebuild is to have its service, im thinking about getting rid of the factory shocks while there, any ideas as to brand (dont really have time for track days) my list includes the following:-
1 replace battery and check all connections to anderson socket
2 deep clean of interior, seats and carpet
3 good clean of engine bay (i know you cant see it but i know its dirty)
4 clean and check of chasis
i also wonder about the front tyres, they are factory original toyo but are now 8 yrs old (still loads of tread as only covered 11000 miles from new) no signs of cracking etc but how old before you would feel they should be changed?
i dont want to do anything that would mean she is not usable as we do have lovley dry (but cold) days over winter.
what other jobs would you recomend i get done?
mark
1 replace battery and check all connections to anderson socket
2 deep clean of interior, seats and carpet
3 good clean of engine bay (i know you cant see it but i know its dirty)
4 clean and check of chasis
i also wonder about the front tyres, they are factory original toyo but are now 8 yrs old (still loads of tread as only covered 11000 miles from new) no signs of cracking etc but how old before you would feel they should be changed?
i dont want to do anything that would mean she is not usable as we do have lovley dry (but cold) days over winter.
what other jobs would you recomend i get done?
mark
Begin a project
1, Source a Cerb rolling shell
2, Source a hybrid engine
3, Source a hybrid gearbox
4, Fabricate a new wiring loom to suit uprated engine and trick interior.
5, Choose suspension set up
6, Choose rim type and size
7, Fabricate Carbon bits, deffusers, rear wing etc
Will take a little longer than winter though...looking at 1 - 2 year poject.
1, Source a Cerb rolling shell
2, Source a hybrid engine
3, Source a hybrid gearbox
4, Fabricate a new wiring loom to suit uprated engine and trick interior.
5, Choose suspension set up
6, Choose rim type and size
7, Fabricate Carbon bits, deffusers, rear wing etc
Will take a little longer than winter though...looking at 1 - 2 year poject.
providing I remain employed and have any money left over after the mortgage, the biggest priority is getting the Griff back on the road. Its only been a couple of years since I started those few little jobs. Just got to re-assemble the engine, finish painting the chassis and sort the dash / electrics now, and I'm sorted.....
After this, it would be good to sort the 4 post lift that recently seems to have arrived. Just need to move the Griff to get it in the garage.
Both the range rovers need TLC ( especialy the off roader ), and the Scooby is due a service.
The house extension is so so close to being finished, and it would be nice to be in by Christmas ( this year )
Mrs Dunc, and both the little Duncs want a few more hours a day out of me, and so does my boss.
Other than, a quiet winter really ( Have I bitten off more than I can chew? )
After this, it would be good to sort the 4 post lift that recently seems to have arrived. Just need to move the Griff to get it in the garage.
Both the range rovers need TLC ( especialy the off roader ), and the Scooby is due a service.
The house extension is so so close to being finished, and it would be nice to be in by Christmas ( this year )
Mrs Dunc, and both the little Duncs want a few more hours a day out of me, and so does my boss.
Other than, a quiet winter really ( Have I bitten off more than I can chew? )
BIG DUNC said:
providing I remain employed and have any money left over after the mortgage, the biggest priority is getting the Griff back on the road. Its only been a couple of years since I started those few little jobs. Just got to re-assemble the engine, finish painting the chassis and sort the dash / electrics now, and I'm sorted.....
After this, it would be good to sort the 4 post lift that recently seems to have arrived. Just need to move the Griff to get it in the garage.
Both the range rovers need TLC ( especialy the off roader ), and the Scooby is due a service.
The house extension is so so close to being finished, and it would be nice to be in by Christmas ( this year )
Mrs Dunc, and both the little Duncs want a few more hours a day out of me, and so does my boss.
Other than, a quiet winter really ( Have I bitten off more than I can chew? )
Well thats sorted October !! What are going to do in Nov,Dec, Jan and FebAfter this, it would be good to sort the 4 post lift that recently seems to have arrived. Just need to move the Griff to get it in the garage.
Both the range rovers need TLC ( especialy the off roader ), and the Scooby is due a service.
The house extension is so so close to being finished, and it would be nice to be in by Christmas ( this year )
Mrs Dunc, and both the little Duncs want a few more hours a day out of me, and so does my boss.
Other than, a quiet winter really ( Have I bitten off more than I can chew? )

Aha - not just me then!
List as follows.....
1.Rear Discs and pads
2.Gaz Golds all round
3.Underbody clean and underseal
4.Touch up stone chips all round
5.Fix inspection bonnet hinge...epoxy here we come!
6.Front end respray
7.Wheel strip, refurb and respray
8.Velcro/reseal rear screen and roof
9.Geometry set up
10.Clean under bonnet
11.Carpet clean, or new ones as they're dirty little buggers!
Think that's it for now!
List as follows.....
1.Rear Discs and pads
2.Gaz Golds all round
3.Underbody clean and underseal
4.Touch up stone chips all round
5.Fix inspection bonnet hinge...epoxy here we come!
6.Front end respray
7.Wheel strip, refurb and respray
8.Velcro/reseal rear screen and roof
9.Geometry set up
10.Clean under bonnet
11.Carpet clean, or new ones as they're dirty little buggers!
Think that's it for now!

HID lights which are winging there way to me know...a chassis clean and waxoyle very soon...change brake pads and that's it as gonna drive as much as possible this winter as was off the road too long early this year while I don't the Emerald upgrade.
BB
HRG happy to host that CAD if you get one done
for people to download and use
BB
BB
HRG happy to host that CAD if you get one done
for people to download and useBB
Those helpful bunnies have been working hard over in the P&P... Should be written up and with Simon by close of play today 
http://www.pistonheads.com/gassing/topic.asp?h=0&a...

http://www.pistonheads.com/gassing/topic.asp?h=0&a...
If I have any money left after buying and winterproofing my Elise, I have only a few things for the Griff seeing as it's already had it's fair share of upgrades this year which have been:
Gaz Gold
17" & 18" Wheels and Tyres
New Steering UJs
HID Lights
LED instrument bulbs
New Clutch Assembly
New Poly Diff Bushes
Mew Magnecore leads, and extendedrs
So I think it may have had it's fair share of money. But I plan to:
Give the interior a good clean. Pull out the seats etc.
Fluid changes.
Geo set up from ummm.. someone goood.
New headlighs as the metal cap that goes over the bulb has falen off on one of mine.
Clear indicators
Smoked rear lights.
Maybe Omex, but after purchasing and modifying an Elise I think I may be dreaming.
Gaz Gold
17" & 18" Wheels and Tyres
New Steering UJs
HID Lights
LED instrument bulbs
New Clutch Assembly
New Poly Diff Bushes
Mew Magnecore leads, and extendedrs
So I think it may have had it's fair share of money. But I plan to:
Give the interior a good clean. Pull out the seats etc.
Fluid changes.
Geo set up from ummm.. someone goood.
New headlighs as the metal cap that goes over the bulb has falen off on one of mine.
Clear indicators
Smoked rear lights.
Maybe Omex, but after purchasing and modifying an Elise I think I may be dreaming.
Gassing Station | General TVR Stuff & Gossip | Top of Page | What's New | My Stuff



) 

I'm going to ask in the P&P to see if someone's got a CAD package and would draw it up properly!
Dont need one myself yet but i guess i would/could just pop over an borrow yours 