Does anyone know where the S2000 is built, is it Japan or elsewhere?

foggy

1,170 posts

288 months

Wednesday 29th September 2004
quotequote all
The S2000 is built at the Tochigi Factory at the Takanezawa Plant in Japan, alongside the NSX.

Good old Google.

piper

Original Poster:

297 posts

274 months

Wednesday 29th September 2004
quotequote all
Thanks foggy

Neil_H

15,341 posts

257 months

Monday 4th October 2004
quotequote all
foggy said:
The S2000 is built at the Tochigi Factory at the Takanezawa Plant in Japan, alongside the NSX.

Good old Google.



Not any more, they moved production to Suzuka earlier this year.

/Edit: Here's the press release:

Honda said:
Suzuka Factory to Begin Integrated Production of Small-Volume Models in May

Tokyo, Japan, Feb 04, 2004 -- Honda Motor Co., Ltd. today announced plans to transfer the production of small-volume automobile models (NSX, Insight, S2000) currently produced at the Takanezawa Plant, Tochigi Factory to its Suzuka Factory in May 2004. This will result in integrated production from engine to completed vehicle being performed in one location. The transfer was initially scheduled to take place this summer, but as it is now possible to achieve with a shorter lead-time, it has been rescheduled for May.

This transfer will be followed by the transfer of engine production for small-volume models from Tochigi Technical Center, Honda Engineering Co., Ltd., to Suzuka Factory. Concentration of production in one location is expected to further improve production efficiency and product quality.

Lines for small-volume vehicle production will be newly established in Suzuka Factory by combining existing equipment with the exclusive equipment transferred from Takanezawa Plant, making it possible to achieve small-volume yet low-cost production characteristics. Concerning engine production, the production equipment for small-volume production models currently used by Tochigi Technical Center, Honda Engineering Co., Ltd. will be transferred to the existing engine plant in Suzuka Factory. Such effective utilization of existing equipment will minimize the costs incurred and result in an efficient transfer of production from one site to the other.


Outline of Suzuka Factory
Location : Suzuka City, Mie Prefecture
Establishment : April 1960
Land area : Approx. 1,205,000 (m2)
Number of employees : Approx. 7,300 (As of the end of January 2004)
Production capacity : (Completed automobiles)
No. 1 Line: 1,100 units/day
No. 3 Line: 1,100 units/day
New line: 60 units/day
Total: 2,260 units/day
Automobile engines : 2,260 units/day
Production models : Civic Series, HR-V, Mobilio series, Fit, Stream, Integra, Life, That's, Partner