Noble M12/M400 Aluminium Heaterbox

Noble M12/M400 Aluminium Heaterbox

Author
Discussion

Skorpion427

Original Poster:

22 posts

95 months

Friday 18th May 2018
quotequote all
There is currently a one time batch being made. Have added a few extra boxes on order for people who missed it.
The heaterbox is professionally produced with lasercutting and folding. So perfect fit, mostly predrilled, only a few holes needs to be drilled since the internals may vary between cars. Designed for RHD cars, and can be used also for LHD (requires 4 extra holes).


3 Aluminium panels to make the box
1 pcs x 3.2 mm drill bit
30 pcs x 3.2 mm rivets
4 pcs x 4.5.mm rivets
1 pcs x grommet
4 pcs x screws for the hatch
2 pcs x 63 mm aluminium flange
An Assembly manual with pictures

Pricing for the total kit
UK : 142 pounds
USA : 190 dollar

Shipping costs (insured and track/trace):
UK : 22 pounds
USA : 48 dollar



Edited by Skorpion427 on Saturday 19th May 10:04

The devil

2,141 posts

190 months

Friday 18th May 2018
quotequote all
So, are there any benefits apart from looks

Skorpion427

Original Poster:

22 posts

95 months

Friday 18th May 2018
quotequote all
The plastic OEM do crack due to age.
This design is made such all the internals and externals swap over.
Aluminium is more resistant to temperature and age. It is also re-usable in case your blower dies. There are some new blowers on the market which fit with minor modifications.

Initial_B

1 posts

102 months

Sunday 10th June 2018
quotequote all
I would be interested in one, if there are any still available? My current unit is cracked and in need of replacement.
sorry i am a bit late to reply.

coolchris

949 posts

209 months

Sunday 10th June 2018
quotequote all
Same here I would be interested too if I am not too late to the party

Skorpion427

Original Poster:

22 posts

95 months

Sunday 10th June 2018
quotequote all
There are only 2 kits left so your both are lucky.
These kits now come complete with the initial optional flanges.
Please send me a pm. Regards

coolchris

949 posts

209 months

Monday 11th June 2018
quotequote all
How do we contact you as your profile doesn't accept e mails.

Cheers

Chris

Skorpion427

Original Poster:

22 posts

95 months

Monday 11th June 2018
quotequote all
Hi Chris, strange. I sent you an email yesterday and the other user was able to reach me via the email on this platform. If you have FB, via the Noble group you also can find me. Sharing my email here is asking for spam so hope you can reach me. Regards

Steve270783

1 posts

77 months

Friday 15th June 2018
quotequote all
Hi there. I really need one of these. Are there any left?
I've only just joined so can't send you an email for 24 hours. I was looking on Google for the a heater box and this came up.
Got money waiting!


Edited by Steve270783 on Friday 15th June 12:05


Edited by Steve270783 on Friday 15th June 12:26

Skorpion427

Original Poster:

22 posts

95 months

Wednesday 25th July 2018
quotequote all
Register is open for second and last production batch.


Edited by Skorpion427 on Saturday 18th August 14:16

Skorpion427

Original Poster:

22 posts

95 months

Friday 17th August 2018
quotequote all
And also a design is ready for the first 20 serial numbers M12 2.5 liter....

LeeNoble

7 posts

74 months

Monday 17th September 2018
quotequote all
Are these still available?

Just picked up my 3R this weekend, and it needs the blower motor replacing - whilst investigating, found the heater box is pretty cracked, and should be replaced

BTW, no - I'm not THAT Lee Noble - my name is Lee, I own a Noble. That is all.

Skorpion427

Original Poster:

22 posts

95 months

Monday 17th September 2018
quotequote all
You are lucky, have some. Not much. Send me a PM

Edited by Skorpion427 on Monday 17th September 21:13

Karldr1974

2 posts

112 months

Tuesday 18th September 2018
quotequote all
Hi. I need one of these too! Just tried to email you but your profile does not allow that.

Possibly my mistake as new to all this.

Skorpion427

Original Poster:

22 posts

95 months

Wednesday 19th September 2018
quotequote all
Hi Karl, I sent you an email. Regards

spec1976

63 posts

136 months

Monday 1st October 2018
quotequote all
Hello, any idea when the second batch of boxes will be ready? Looking forward to doing this project in the coming months

Skorpion427

Original Poster:

22 posts

95 months

Monday 1st October 2018
quotequote all
Second and last batch is ready. Sent me a PM if you want one.

The devil

2,141 posts

190 months

Monday 1st October 2018
quotequote all
Tried to PM you but it says you don't take emails

Skorpion427

Original Poster:

22 posts

95 months

Monday 1st October 2018
quotequote all
Strange because other people were able to reach me via email on this forum. I will try to email you

Skorpion427

Original Poster:

22 posts

95 months

Monday 1st October 2018
quotequote all
Skorpion427 said:
I sent you both an email, adjusted the setting on this forum to be able to receive emails
Edited by Skorpion427 on Tuesday 2nd October 16:33