Workshop times
Discussion
Interesting, I have run a race car so know most of the shortcuts and have had lots of practice pulling a Noble apart, but some of those are so wrong.
A good one is taking an engine out takes longer than a gearbox.I'm assuming you don't have to add all the other associated operations on.
And 4 hours for a front turbo, does that include manufacturing the turbo?
A good one is taking an engine out takes longer than a gearbox.I'm assuming you don't have to add all the other associated operations on.
And 4 hours for a front turbo, does that include manufacturing the turbo?
Edited by Adrian W on Wednesday 20th August 09:51
mgbond said:
Adrian W said:
.....And 4 hours for a front turbo, does that include manufacturing the Turbo
Probably takes into account that the bolts/nuts can bind. Garage just took over a day trying to get mine off to change gaskets and sheared the odd stud. Gassing Station | Noble | Top of Page | What's New | My Stuff