Calais Port Problems

Calais Port Problems

Author
Discussion

andy_vtec

Original Poster:

355 posts

248 months

Monday 7th March 2005
quotequote all
Does anyone have any information about when the French boys will finish the building work on the Calais Docks (as I remember someone died and a few were injured when a cable snapped at one of the ferry berths)

Only asking as my boss went to Brugge for the weekend last Friday, and it took him 8 hours on the ferry to get across the channel, as it sat outside of Calais (there were only 2 berths open), and P&O seemed to be at the back of the queue (and kept there).

DJFish

5,964 posts

270 months