G50/03 Gearbox Clearance with Chassis
Discussion
Hi Chaps,
Put my engine and box in last night and the gearbox is very close to the top chassis rail. I will have to cut the box section to get a breather pipe in, but there is about 1mm clearance. Is this normal? I could machine a bit off the box to aid the issue, but I'm not sure if this is normal. Also drilling a fairly large hole in the box section must weaken it. Any thoughts or advice? Gearbox is a G50/03.
Many thanks.
Martin
Put my engine and box in last night and the gearbox is very close to the top chassis rail. I will have to cut the box section to get a breather pipe in, but there is about 1mm clearance. Is this normal? I could machine a bit off the box to aid the issue, but I'm not sure if this is normal. Also drilling a fairly large hole in the box section must weaken it. Any thoughts or advice? Gearbox is a G50/03.
Many thanks.
Martin
The whole lot will settle when the mounts start to squish so don't worry about the clearance. You won't end up with much more than that under the sump.
I also had to drill through the cross member for my breather fitting. Drilled with enough clearance for a long series socket. Nothings broken after five years.
Steve
I also had to drill through the cross member for my breather fitting. Drilled with enough clearance for a long series socket. Nothings broken after five years.
Steve
I drilled and tapped the side plate with the two hex' screw heads to fix my breather pipe . This way with the plate removed I didn't get swarf in the 'box . Also this plate/hole is a convenient place to put a hose in to refill the 'box with oil . Also I filed the top of the 'box to get a good clearance .
Frank
Frank
Edited by 60mph on Friday 28th August 09:29
60mph said:
I drilled and tapped the side plate with the two hex' screw heads to fix my breather pipe . This way with the plate removed I didn't get swarf in the 'box . Also this plate/hole is a convenient place to put a hose in to refill the 'box with oil . Also I filed the top of the 'box to get a good clearance .
Frank
When I bought my G50/03 from the factory some 9 years ago, it came with this very modification already done. Frank
Edited by 60mph on Friday 28th August 09:29
RussF said:
A typical over engineered solution would be to re-design and re-manufacture the cover plate with an additional island in the center...guess why my build has taken 3 and half years so far
.
Design

End result - pre polishing and anodising

Russ, you're a bloody nightmare
. Design

End result - pre polishing and anodising

You know Le Mans is only 9 months away now, don't you??moribund said:
Russ, you're a bloody nightmare
You know Le Mans is only 9 months away now, don't you??
Yes Yes I know, on both counts. Thanks for the reminder!
You know Le Mans is only 9 months away now, don't you??spatz said:
russ any pics of your project ?build site ?
spatz, sorry I missed your post the first time round..will upload some pics onto flickr this weekend and send a link.Russ
Gassing Station | Ultima | Top of Page | What's New | My Stuff