Hitachi 800 Class testing
Discussion
Just seen one of the new Hitachi 800 class trains (is it technically a multiple unit I suppose as it looked like 2 x 5 car units?) pass through Maidenhead heading for Paddington. So they've started testing them on the Western mainline now... Can't find much news about them on the internet other than Hitachi press releases. I wonder if there's much chat on the rail forums?
What you are seeing is the pre-production units I believe. The western region will be served with 5 car Class 800 units, 9 car class 801 units, and a mixture of 5 & 9 car class 802 units:
https://en.wikipedia.org/wiki/British_Rail_Class_8...
https://en.wikipedia.org/wiki/British_Rail_Class_8...
https://en.wikipedia.org/wiki/British_Rail_Class_8...
https://en.wikipedia.org/wiki/British_Rail_Class_8...
https://en.wikipedia.org/wiki/British_Rail_Class_8...
https://en.wikipedia.org/wiki/British_Rail_Class_8...
Edited by Boatbuoy on Monday 18th July 10:06
Europa1 said:
RichB said:
Yertis said:
What's going to happen to the 125s?
Scrapped I imagine. I don't if they're the sort of thing that gets preserved? maybe one set?http://www.preserved-diesels.co.uk/engines/index.h...
I suspect that probably around 20-40 engines will get saved
RemyMartin said:
There is also the issue of the West Country. There will be no electrics down to Penzance for a while and I don't think they have enough bi mode trains (even though they ordered more)
According to those wiki links (and I don't know, which is why this thread is of interest to me) the 802 Class is intended for lines west of Bristol, equipped with more powerful diesel engines for the steeper gradients on the routes in the West Country. As mentioned above the HSTs will be cascaded to Scotland and to carry on on the un -wired bits of the network particularly in the south West.
They have recently been testing them in shorter 4/5 car formations to increase acceleration and decrease dwell times.
They will likely have to have the mk3 carriages overhauled and retrofitted with power doors to be disabled access compliant.
There is a shortage of stock so I doubt they will be scrapped.
The longer 9 car IET trains will operate the trunk routes like Paddington-Bristol. Doubled up 5 car units will operate say to exeter/Plymouth with a single unit them carrying onto Penzance.
They have recently been testing them in shorter 4/5 car formations to increase acceleration and decrease dwell times.
They will likely have to have the mk3 carriages overhauled and retrofitted with power doors to be disabled access compliant.
There is a shortage of stock so I doubt they will be scrapped.
The longer 9 car IET trains will operate the trunk routes like Paddington-Bristol. Doubled up 5 car units will operate say to exeter/Plymouth with a single unit them carrying onto Penzance.
Nine-Eighty-Six said:
The HSTs still look bloody awesome, don't they?
Haven't really aged at all - hard to believe they're over 40 years old now.
Yes they do. A design classic to rank alongside Concorde and the E-type, IMO. I think the most elegant diesel electric, or diesel or electric for that matter, locomotives/trains ever built.Haven't really aged at all - hard to believe they're over 40 years old now.
Gassing Station | Boats, Planes & Trains | Top of Page | What's New | My Stuff





