Oversized, slow moving load 17-19 Aug, to Weybridge

Oversized, slow moving load 17-19 Aug, to Weybridge

Author
Discussion

Trevatanus

Original Poster:

11,215 posts

157 months

Thursday 9th August 2018
quotequote all
Just seen this, will I guess will have some traffic fallout, hopefully minimum due to the times of travel, but will take up 2 lanes and travel at 12 mph on the M25 for a number of hours.

https://www.getsurrey.co.uk/news/surrey-news/m25-t...

https://www.eagleradio.co.uk/news/local-news/26577...

Edited by Trevatanus on Tuesday 14th August 15:52

SVTRick

3,633 posts

202 months

Sunday 19th August 2018
quotequote all
Well that was quite a sight, slow moving along A320 into Woodham, Woking.
Reminds me when I was 2nd man on Low Loader moving earth moving equipment from out Depot next to Jn11 M25 to various
locations along the M25 bearing in mind is was not completed.
The route took us from Addlestone / Chertsey via Byfleet, Esher, Leatherhead, Reigate to Godstone.
Earning some good coin as young apprentice.


Trevatanus

Original Poster:

11,215 posts

157 months

Tuesday 21st August 2018
quotequote all
Twas quite a beast. Was too late to catch it on the move, but found it in the end.

Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Abnormal load delivery of a generator by Jim Pritchard, on Flickr
Abnormal load delivery of a generator by Jim Pritchard, on Flickr